Welcome to Wisconsin Department of Transportation - 511 Travel Information

511 Wisconsin Logo
WISDOT Logo511wi Travel Information Header
ALERTS:
View All Alerts
printer icon
<< < 1 2 3 4 5 6 7 8 9 10 > >>
Start / Expected End Time County Highway Type Description/Location Detour Information Update Time
7/19/10 - 10/22/10
Long Term
Adams WIS 21 EB Construction Mainline Single Lane Closed at WAYSIDE DRWY 7/7/10 5:50 PM
7/19/10 - 10/22/10
Long Term
Adams WIS 21 WB Construction Mainline Single Lane Closed at 22ND AVE 7/7/10 5:48 PM
9/7/10 - 9/27/10
6:00 AM - 8:00 PM
Daily/Nightly
Adams WIS 13 NB Construction Mainline Full Closure from CTH D/ SIGNALIZED to HASA LA STH 21 East to I39 North I39 North to STH 73 West 8/17/10 3:53 PM
9/7/10 - 10/22/10
6:00 AM - 7:00 PM
Daily/Nightly
Adams WIS 21 EB Construction Mainline Flagging Operation from WISCONSIN RIVER 18 to STH 13 NB 8/25/10 4:41 PM
9/7/10 - 10/22/10
6:00 AM - 7:00 PM
Daily/Nightly
Adams WIS 21 WB Construction Mainline Flagging Operation from STH 13 NB to WISCONSIN RIVER 18 8/25/10 4:47 PM
6/14/10 - 9/7/10
7:00 AM - 5:00 PM
Daily/Nightly
Ashland WIS 13 NB Construction Mainline Right Lane Closed from NORTHLAND COLLEGE to STH 13N (END DIVIDED) 9/1/10 8:33 AM
6/14/10 - 9/7/10
7:00 AM - 5:00 PM
Daily/Nightly
Ashland WIS 13 SB Construction Mainline Left Lane Closed from STH 13N (END DIVIDED) to NORTHLAND COLLEGE 9/1/10 8:33 AM
7/14/10 - 10/25/10
12:00 AM - 12:00 AM
Daily/Nightly
Ashland US 2 WB Construction Mainline Full Closure at BEASER AVE No signed detour 7/26/10 11:02 AM
7/27/10 - 10/24/10
Long Term
Barron US 53 NB Construction Mainline Left Lane Closed from USH 8 to MILE POST 149 7/15/10 7:21 AM
7/27/10 - 10/24/10
Long Term
Barron US 53 SB Construction Mainline Right Lane Closed from MILE POST 149 to USH 8 7/15/10 7:21 AM
<< < 1 2 3 4 5 6 7 8 9 10 > >>
Data Last Updated: 9/2/10 11:20 AM