|
|
|
Start / Expected End Time
|
County
|
Highway
|
Type
|
Description/Location
|
Detour Information
|
Update Time
|
6/22/10 - 9/10/10
6:00 AM - 9:00 PM
Daily/Nightly
|
Marathon
|
WIS 97 SB
|
Construction
|
Mainline Flagging Operation from SOUTH ST to ASH ST
|
|
9/1/10 9:31 AM
|
7/15/10 - 9/23/10
Long Term
|
Marquette
|
WIS 73 NB
|
Construction
|
Mainline Single Lane Closed from BERLIN ST E to CTH E / CTH N
|
|
9/1/10 9:15 AM
|
7/15/10 - 9/23/10
Long Term
|
Marquette
|
WIS 73 SB
|
Construction
|
Mainline Single Lane Closed from CTH E / CTH N to BERLIN ST E
|
|
9/1/10 9:14 AM
|
7/12/10 6:00 AM -
9/10/10 12:00 PM
Continuous
|
Outagamie
|
WIS 47 SB
|
Permit
|
Mainline Full Closure from STH 54 EB to BURDICK ST
|
Exsting Detour for STH 47 on STH 55 to CTH S to STH 47
|
9/1/10 8:40 AM
|
7/12/10 6:00 AM -
9/10/10 12:00 PM
Continuous
|
Outagamie
|
WIS 47 NB
|
Permit
|
Mainline Full Closure from BURDICK ST to STH 54 EB
|
STH 47 to CTH S to STH 55 to existing STH 47 Detour on STH 55
|
9/1/10 8:39 AM
|
6/14/10 - 9/7/10
7:00 AM - 5:00 PM
Daily/Nightly
|
Ashland
|
WIS 13 SB
|
Construction
|
Mainline Left Lane Closed from STH 13N (END DIVIDED) to NORTHLAND COLLEGE
|
|
9/1/10 8:33 AM
|
6/14/10 - 9/7/10
7:00 AM - 5:00 PM
Daily/Nightly
|
Ashland
|
WIS 13 NB
|
Construction
|
Mainline Right Lane Closed from NORTHLAND COLLEGE to STH 13N (END DIVIDED)
|
|
9/1/10 8:33 AM
|
9/1/10 - 9/2/10
12:00 PM - 3:30 PM
Daily/Nightly
|
Douglas
|
US 53 SB
|
Maintenance
|
Mainline Various Lanes Closed from WIS. CENTRAL RR to WIS. CENTRAL RR
|
|
9/1/10 8:28 AM
|
9/8/10 - 9/9/10
6:30 PM - 5:00 AM
Daily/Nightly
|
Brown
|
US 41 SB
|
Maintenance
|
Mainline Right Lane Closed from ON RAMP FROM ONEIDA ST to PARK VIEW RD
|
|
9/1/10 8:03 AM
|
5/18/10 - 9/3/10
Long Term
|
Outagamie
|
WIS 47 SB
|
Construction
|
Mainline Full Closure from STH 125 EB to PROSPECT ST
|
Detour route signed via WIS 41 and WIS 441.
Also alternate route for downtown traffic signed via College Avenue, Oneida Street and Calumet Street
|
9/1/10 7:31 AM
|
|
|